Skip to content
Act 854 s.22(1)(a) · Arahan KE NACSA No. 5 (v2) · Direct Engineering Delivery

Malaysia NCII Cyber Security
Risk Assessment Services

Combine Skylance EASM passive discovery with our MY-NCII 5×5 workbench to turn your asset inputs into an editable Directive No. 5 .docx report & .xlsx register.

Skylance NCII Risk Assessment Product Flow
NCII Web Gatewayportal.example.my

Skylance NCII Engine

Dir. No. 5 · Para 9.1–9.4

Directive No. 5 Para 9.1–9.44/4 Clauses Mapped
Passive Non-Intrusive ScopeZero Production Impact
Direct Skylance DeliveryNo Local Subcontractor
ncii.score(dir5Para9, iso27005_5x5)
Noise SuppressedLow-signal banners consolidated
Inherent Risk 20 · Very HighExposed admin UI + legacy TLS
Reduction · ISO 27002 8.20VPN/MFA gate -> Residual 4 (Low)
Act 854 s.22(1)(a) · Dir. No. 5 · Direct TeamNon-intrusive passive review · Zero production loadNot Statutory Audit · No P.U.(A) 221 Pentest/MSOC

Stop wrestling with 40-page static compliance spreadsheets. Run asset intake, interactive 5×5 scoring, and editable Directive No. 5 report packaging in one workspace.

MY-NCII Report Workbench Product

Interactive 5×5 Risk Scoring & 7-Chapter Report Preview

MY-NCII Workspace · Editable Deliverable Preview
Click an NCII asset row to inspect
ISO/IEC 27005 · 5×5 Heatmap (1–25)
Inherent Risk: 20Post-Treatment Residual: 4
Likelihood (1–5)
5
10
15
20
25
4
8
12
16
20INHERENT
3
6
9
12
15
2
4
6
8
10
1
2
3
4RESIDUAL
5
Impact (1–5 CIA Max) (1 → 5)C4 · I5 · A4 (Max 5)
Treatment (Para 8.3.1)Reduction (Pengurangan)
Control MappingISO/IEC 27002 8.20 / 8.5
Target Timeline0–14 days

Internet-facing admin UI without VPN/SSO MFA → Enforce VPN + SSO MFA & upgrade gateway TLS baseline.

Delivery & Statutory Boundaries

Direct Engineering Execution — Strict Legal Separation

Skylance NCII Scope & Non-Audit Guardrails
s.22(1)(a) Prep Only
Boundary ControlsInspect active scope rules
Policy S1 · Direct Internal Engineering TeamDirect Delivery
Execution ModelSkylance Internal Engineers
Local SubcontractingNone (No Proxy Partners)
Delivered FilesEditable .docx + .xlsx
CustomizationSupports s.25 Sector Codes

Explicit Non-Audit & Non-Licensed Exclusions

Clear procurement guardrails under Act 854

In Scopes.22(1)(a) risk assessment prep & passive perimeter checks
Excluded: Auditss.22(1)(b) / Directive No. 8 biennial statutory audits (>=30d approval)
Excluded: P.U.(A) 221Licensed Malaysia active pentesting or MSOC monitoring
Claims PolicyNo NACSA licence, auditor accreditation, or endorsement claimed
No Statutory AuditNo Local SubcontractorNo P.U.(A) 221 Pentest / MSOCNo Unverified Endorsement
Clear statutory boundary: technical preparation & editable .docx/.xlsx deliverables only; final entity filing stays with the NCII operator.
Editable Sample Deliverables Pack

Unlock the synthetic .docx report & .xlsx 5×5 register

Submit corporate contact info to download editable templates (*.example.my) immediately.

.DOCX
7-Chapter NCII Sample ReportDirective No. 5 Para 9.1–9.4 + Contoh Laporan format (*.example.my).
.XLSX
5×5 Register, Scales & Input Checklist3 editable Excel sheets covering scoring, ISO 27002 controls & 8.1.1 intake.

Prepared directly by Skylance internal engineers (no local subcontracting). Synthetic *.example.my templates only.

Enter organization info to download

Corporate email required (free webmail excluded).

Notifies Skylance engineering and unlocks 24-hour signed links right here.

Procurement FAQ

Quick Answers on Scope, Products & Act 854

Does this replace the biennial statutory audit under Act 854?
No. Risk assessments (s.22(1)(a), yearly) and statutory audits (s.22(1)(b) / Directive No. 8, biennial with NACSA >=30-day prior approval) are legally distinct.
Does Skylance partner with local Malaysian firms or claim a NACSA licence?
No. Our internal team delivers directly without local partners; we exclude P.U.(A) 221 licensed active pentesting/MSOC and claim no NACSA licence or endorsement.
Who submits the finalized Directive No. 5 report to NACSA?
Under Para 8.5, the designated NCII entity submits its finalized report to [email protected] and its Sector Lead using our editable .docx/.xlsx package.
Are the 7 chapters and 5×5 scales rigid word-for-word?
Dir. 5 Para 9.1–9.4 sets mandatory topics while Contoh Laporan (.docx) and the 5×5 Toolkit are illustrative; Sector Lead s.25 rules can be adjusted in our editable files.
Are portal.example.my and mail.example.my real client findings?
No. All *.example.my entries are synthetic sample placeholders demonstrating how passive findings map into ISO/IEC 27002 treatment sheets.
What inputs do we provide, and can we preview the files first?
Provide your 5-class asset inventory, architecture notes, Sector Lead context, and passive domain authorization; submit the Sample Pack form above to download .docx + .xlsx templates now.
Request NCII Assessment Scoping

Scope your Malaysia NCII deliverables in one call.

Share your system boundary and annual assessment window; we confirm inputs and editable .docx / .xlsx milestones within 1 business day.

Act 854 s.22(1)(a) alignedEditable .docx & .xlsxDirect internal team
Scope NCII risk assessment

Engineering scoping reply within 1 business day.